The Opportunity

Unparalleled Scale 1,800 acres

16 million sqft of potential GLA.

Vast Water Capacity

Gigafactory-Scale Demand. U.S.-Mexico Supply

The corridor every EV, battery, aerospace and AI infrastructure player now needs.

$ 1.4T
U.S. manufacturing capex announced 2023-2024
EV / battery, semiconductor, aerospace, AI
10x
Land cost gap: Southern California vs Baja California
Same logistics radius. Different math.
60 mi
From Centinela to the Salton Sea Lithium Valley
Noth America’s largest known lithium reserve
9 mi
From Centinela to the U.S. border (Calexico)
Inside the samer logistics envelope